OCTOBER 2019

Provision of Pipeline Pre-Commissioning

  •  12″x19.475km from KSM WHA to ZTG WHA

SEPTEMBER 2019

Provision of Transportation and Installation of Subsea
Flexible Pipeline and Risers for Layang Development Project

  •  13″x2.5km from HIP to FPSO 10″x2.5km from FPSO to HIP 11″x4.8km from LWP to FPSO

JUNE 2019

Provision of Pre-Commissioning Servics for HESS Project Year 2019
Provision of Pipeline Cleaning, Gauging, Flooding, Hydrotesting, Dewatering, Air Drying & Nitrogen Packing

  •  Offshore Pipeline: 12”x19.475Km Piepline from Bunga Zeting WHP-Bunga Kesumba WHP

MAY 2019

Provision of Pre-Commissioning Services for PCSB P6 Project Year 2019

Provision of Pre-Commissioning (Cleaning, Gauging, Filling and Hydrotesting)- Subsea to Top of Riser for Sectional Pipeline Replacement

 

  • Offshore Pipeline: PL293 16”x2Km D25R-A to Subsea

APRIL 2019
PFLNG1 Relocation

Decommissioning (Deoiling, Flushing, Dewatering, Nitrogen Drying & Nitrogen Packing) for existing flowline. Precommissioning (Cleaning, Gauging, Filling, Leak Testing, Riser Annulus Vacuum Testing, Dewatering, Nitrogen Drying & Nitrogen Packing) for new flowline

  • Offshore Pipeline: 10” x 3.5Km KAKG-A to PFLNG1 (Existing)
  • Offshore Pipeline: 10” x 5.7Km KBB to PFLNG1 (New)

MARCH 2019

Installation of Subsea Pipeline Works at Gulf of Suez Provision of Leak Tetsing for Pulling Heads at SOEB

  • Offshore Pipeline: 3nos.18”,1no.12” and 2nos.8”

NOVEMBER 2018

PAN Malaysia Transportation and Installation of Offshore Facilities (for year 2017-2018)
Anjung Pipeline- Provision of Pipeline Wet Buckle Contingency Flushing and Dewatering

  •  Offshore Pipeline: 18”x8.5Km Condensate Gas Pipeline AJJT-A to KAKG-A CRA coated

PIPELINE Inspection- Eddy Current CAM Pig Inspection with product

  •  Offshore Pipeline: 16”x16Km Oil Pipeline SEMN21L to STG30L

Pipeline Inspectin Support Service – Line Proving, aggressive cleaning (wax removal) and assist Inline Inspection Tool pumping

  •  Onshore Pipeline: PID 1101: 8”x0.7Km Oil Pipeline SEMN21L to STG30L

OCTOBER 2018

PAN Malaysia Transportation and Installation of Offshore Facilities (for year 2017-2018)
SSB 2018 Pipeline- provision of pipeline pre-commissioning

  •  Offshore Pipeline: 16”x16Km E6DPR-E8DRA Nitrogen re-purging/ re-packing

SEPTEMBER 2018

Provision of Pipeline Flushing Services for F23 SW Removal Work for SSB Project Year 2018

  •  Offshore Pipeline: 12”x7.1Km Condensate Gas Pipeline Flushing (hydrocarbon removal) from Subsea Wellhead to F23DP-A Platform

EPCC FOR Prai Terminal Diesel Subsea Pipeline Relacement- Provision of Pipeline cleaning, gauging, flooding and hydrotesting

  •  Onshore Pipeline: 10” x900m Rigid Pipeline from Onshore Terminal to Offshore Offloading Terminal

AUGUST 2018

PAN Malaysia Transportation and Installation of Offshore Facilities (For Year 2017-2018)
SSB 2018 Pipeline – Provision of Pipeline pre-commissioning
10” & 16”- Spool Testing, Flooding for tie-in, cleaning, gauging, filling and hydrotesting
16”- Dewatering, air drying and nitrogen purging/ packing

  •  Offshore Pipeline: 10”x68Km E6DPA-D35DRA
  •  Offshore Pipeline: 16”x16Km E6DPR-E8DRA

JULY 2018

Flexible Flowline, Riser and Export Hose Pre-Commissioning for FSO Mekar Bergading- Provision of Filling and Leak Testing

  •  Offshore Pipeline: 6” x2.5Km Condensate Gas Flexible Flowline WHHP Platform to FSO Mekar Bergading
  •  Offhore Pipeline: 16”x300m Export Hose from FSO Mekar Bergading to Floating End

JUNE 2018

SEPAT and Riser Temporary Disengagement and Hook-Up Campaign for Petronas Carigali Sdn Bhd- Provision of Flexible Flowline Flushing/ Pigging, Leak Testing and Annulus Vacuum Testing

  •  Offshore Pipeline: 6”x200m Crude Oil Flexible WHHP Platform to Sepat A FSO

MAY 2018

Ultrasonic Inteligent Pigging Inspection for Gas Lift Pipeline- Provision of equipment and personnel for pipeline cleaning, auxiliary pumping for UTIP, dewatering, air drying and nitrogen packing

  •  Offshore Pipeline: 4”x20Km EBA Platform to CHRA Platform
  •  Offshore Pipeline: 4”x7.5Km Platform to WBA Platform

Provision of Pre-Commissioning Services for PCSB P6 Project Year 2019
Provision of Pre-Commissioning (cleaning, gauging, filling and hydrotesting)- subsea to top of riser for sectional pipeline replacement

  •  Offshore Pipeline: PL293:16”x2Km D35R-A to Subsea

MARCH 2018

Installation of Subsea Pipeline Works at Gulf of Suez Provision of LEAK Testing for Pulling Heads at SOEB

  •  Offshore Pipeline: 16”x2km D35R-A to Subsea

FEBRUARY 2018

Crude Oil Transfer for West Desaru Pipeline: Supply of Oil Discharge Hoses and Fittings for Crude Oil Transfer

  •  Offshore Pipeline: 8” x 12km West Desaru Platform to FPSO

JANUARY 2018

Pipeline De-Inventory, Cleaning, and Auxiliary Pumping for
Intelligent Pigging (MFL)

  • Offshore Pipeline: 10″, LP Oil

Pipeline Nitrogen Pumping for In-Line Inspection (MFL Crawler)

  •  Offshore Pipeline: 10″, vent line

Emergency Pipeline Nitrogen Pumping for In-Line Inspection (MFL)

  • Onshore Pipeline: 10″, vent line

Emergency Pipeline Crude Oil Transfer for In-Line Inspection (MFL)
[AP/18-1]

  •  Offshore Pipeline: 8″ x 12,000 m, FWS

Emergency Pipeline High Pressure Pumping for In-Line Inspection (MFL)
[AP/17-68]

  •  Onshore Pipeline: 28″, Gas

NOVEMBER 2017

Pipeline Isolation Support using Nitrogen Pumping

  •  Offshore Pipeline: 10″ x 24,748 m, gas

Pipeline De-Inventory, Cleaning, Auxiliary Pumping for
Intelligent Pigging (UT) and Assist Commissioning

  •  Offshore Pipeline: 12″ x 1,870 m, LP Oil
  •  Offshore Pipeline: 8″ x 1,900 m, LP Oil
  •  Offshore Pipeline: 6″ x 1,338, LP Oil 1
  •  Offshore Pipeline: 6″ x 1,338, LP Oil 2

Pipeline De-Inventory, Cleaning, and Preservation

  •  Offshore Pipeline: 8″ x 8,000 m, CHPS

SEPTEMBER 2017

Pipeline De-inventory and Preservation:

  •  Onshore Pipeline: 6” x 1,500 m, multiphase
  •  Onshore Pipeline: 6” x 900 m, multiphase
  •  Onshore Pipeline: 6” x 600 m, multiphase

Pipeline De-Inventory, Cleaning and Auxiliary Pumping for
Intelligent Pigging (UT)

  • Onshore Pipeline: 10″ x 500 m, diesel
  • Onshore Pipeline: 10″ x 500 m, petrol

AUGUST 2017

Pipeline De-inventory, cleaning and auxiliary pumping for
Intelligent Pigging (MFL)

  •  Onshore Pipeline: 10” x 1,100 m multiphase

JULY 2017

Pipeline Inspection: Wall thickness and debris mapping survey

  • • Offshore Pipeline: 16″ x 16,000 m, multiphase

JUNE 2017

Flowline Degassing and Cleaning

  •  Offshore Pipeline: 12″ x 1,480 m, Import Flowline and Riser

Pipeline Degassing, Nitrogen Purging and Packing

  •  Offshore Pipeline: 10″ x 230 m, Export Flexible Riser
  •  Offshore Pipeline: 16″ x 53,000 m, Export Pipeline

MAY 2017

Pipeline De-Inventory and Cleaning

  •  Offshore Pipeline: 12″ x 2,631 m HHP
  •  Offshore Pipeline: 8″ x 4,765 m CHPS

Pipeline De-Inventory, Cleaning and auxiliary pumping for
Intelligent Pigging (UT)

  • Offshore Pipeline: 16″ x 4,765 m HHP

APRIL 2017

Pipeline De-Inventory, Cleaning and Preservation

  •  Offshore Pipeline: 24″ x 80,000 m TL
  •  Offshore Pipeline: 12″ x 533 m FL
  •  Onshore Pipeline: 16″ x 320 m FL

JANUARY 2017

Pipeline De-inventory, cleaning and auxiliary pumping for
Intelligent Pigging (UT)

  • Offshore Pipeline: 6” x 2,150 m GL

Pipeline De-inventory, cleaning and auxiliary pumping for
Intelligent Pigging (UT)

  • Offshore Pipeline: 12” x 2,150 m MULTIPHASE OIL

DECEMBER 2016

Flowline and export hose de-inventory, cleaning and Hydrostatic Test

  •  Offshore Flexible Flowline: 6″ x 1,787 m FWS
  •  Onshore and Offshore Export Hose: 12″

OCTOBER 2016

Pipeline De-inventory, cleaning and auxiliary pumping for
Intelligent Pigging (MFL)

  •  Offshore Pipeline: 12″ x 1,824 m Multiphase

Pipeline de-inventory, cleaning, auxiliary pumping for Intelligent
Pigging (UT), dewatering, drying and N2 Purging

  • Offshore Pipeline: 12” x 4.849 km IP

SEPTEMBER 2016

Pipeline de-inventory and cleaning

  • Offshore Pipeline: 16” x 2,082 m LP

JULY 2016

Pipeline de-inventory, cleaning, hydrostatic test and auxiliary pumping for Intelligent Pigging

  •  Offshore Pipeline: 12″ x 2,500 m HHP

Pipeline de-inventory, cleaning and auxiliary pumping for
Intelligent Pigging (UT)

  • Offshore Pipeline: 4″ x 1,660 m GL
  • Offshore Pipeline: 8″ x 1,660 m FL

Pipeline de-inventory, cleaning and auxiliary pumping for
Intelligent Pigging (MFL)

  • Offshore Pipeline: 12″ x 2,631 m Multiphase

Pipeline de-inventory, cleaning and auxiliary pumping for
Intelligent Pigging (MFL)

  • Offshore Pipeline: 8″ x 600 m LP

Pipeline de-inventory, cleaning and auxiliary pumping for
Intelligent Pigging (MFL)

  • Offshore Pipeline: 8″ LP

JUNE 2016

Pipeline de-inventory, cleaning and auxiliary pumping for Intelligent Pigging (MFL) using (Nitrogen pumping)

  •  Onshore Pipeline: 16” x 17 km

APRIL 2016

Pipeline de-inventory, cleaning and auxiliary pumping for Intelligent Pigging (UT)

  •  Offshore Pipeline: 12″ HP

NOVEMBER 2015

Pipeline de-inventory, cleaning, hydrostatic test and auxiliary pumping

  •  Offshore Pipeline: 6″ x 2.7 k

OCTOBER 2015

Pipeline de-inventory, cleaning, hydrostatic test and auxiliary umping

  •  Offshore Pipeline: 12″ HHP

AUGUST 2015

Pipeline de-inventory, cleaning, hydrostatic test and auxiliary pumping

  •  Offshore Pipeline: 8″ x 2.7 km

Pipeline de-gassing, cleaning, auxiliary pumping for IP, de-watering & N2 purge

  •  Offshore Pipeline: 8″ x 2.75 km

MAY 2015

Pipeline de-inventory, cleaning, hydrostatic test and auxiliary pumping for intelligent pigging

  •  Offshore Pipeline: 8” x 3,060 m

Provision of Services on Methanol Export Facility (MEF)
Underwater Remedial Works: Flushing, hydrostatic test, dewatering & vacuum test for subsea & floating hoses.

APRIL 2015

Pipeline de-inventory, cleaning, hydrostatic test and auxiliary pumping for intelligent pigging

  •  Offshore Pipeline: 12” x 2,040 m

FEBRUARY 2015

Pipeline de-inventory, cleaning, hydrotest, dewatering, drying, N2 pack and auxiliary pumping for calliper pigging

  •  Onshore Pipeline: 12″ x 8 km

NOVEMBER 2014

Pipeline de-inventory, cleaning, hydrotest and auxiliary pumping for intelligent pigging

  •  Offshore Pipeline: 12” x 2,040 m

OCTOBER 2014

Pipeline de-inventory, cleaning, hydrostatic test and auxiliary pumping for intelligent pigging

  •  Offshore Pipeline: 16” x 13,315 m

JUNE 2014

Provision of operational pigging data analysis services for 41 onshore and offshore pipelines

SEPTEMBER 2013

Pipeline de-inventory, cleaning, hydrostatic test, de-watering
and auxiliary pumping for intelligent pigging

  •  Offshore Pipeline: 10″ x 14 km

AUGUST 2013

Pipeline flushing and de-inventory

  •  Offshore Pipeline: 10″ x 39 km, Multiphase oil