PIPELINE SERVICES: PROVISION OF PIPELINE PRE-COMMISSIONING,
COMMISSIONING & DE- COMMISSIONING SERVICES
TRACK RECORD (as of 31st August 2019)

Vol Project Description Pipeline Start Complete Client Location
1 PFLNG1 Relocation
Decommissioning (Deoiling, Flushing, Dewatering, Nitrogen Drying & Nitrogen Packing) for existing flexible flowline.
Precommissioning (Cleaning, Gauging, Filling, Leak Testing, Riser Annulus Vacuum Testing, Dewatering, Nitrogen Drying & Nitrogen Packing) for new flexible flowline.
10″x3.5km KAKG-A to PFLNG1 (Existing) 10×5.7km KBB to PFLNG1 (New) 10-Nov-18 29-Apr-19 Petronas Floating LNG1 (L) Ltd / DelSol Offshore Sdn Bhd/ Starke Marine Sdn Bhd
Offshore Sarawak / Offshore Sabah
2 Pipeline Inspection – Eddy Current CAM Pig inspection with product 16″x16km Oil Pipeline Gu-A/Tap-A 22-Oct-18 12-Nov-18 ExxonMobil Exploration & Production Malaysia Inc / Armada Technology
Offshore Terengganu, Malaysia
3 Pipeline Inspection Support Service – Line proving, aggressive cleaning (wax removal) and assist InLine Inspection Tool pumping PID 1101: 8″x0.7km Oil Pipeline SEMN21L to STG30L 15-Oct-18 9-Nov-18 Brunei Shell Petroleum / Tractor Petroleum Services / J- Rahman Oilfields & Logistics Sdn Bhd Onshore Brunei
4 PAN Malaysia Transportation and Installation of Offshore Facilities (for Year 2017-2018)
SSB 2018 Pipeline – Provision of pipeline pre- commissioning
16″ – Nitrogen re-purging/re-packing
16″x16km E6DPR-E8DRA 1-Oct-18 15-Oct-18 Sarawak Shell Berhad / Sapura Offshore Sdn Bhd
Offshore Sarawak, Malaysia
5 PAN Malaysia Transportation and Installation of Offshore Facilities (for Year 2017-2018)
Anjung Pipeline – Provision of pipeline wet buckle contingency flushing and dewatering
18″x8.5km Condensate Gas Pipeline AJJT-A to KAKG-A CRA coated 5-Sep-18 16-Nov-18 Petronas Carigali Sdn Bhd / Sapura Offshore Sdn Bhd
Offshore Sarawak, Malaysia
6 Provision of Pipeline Flushing Services for F23 SW Removal Work for SSB Project Year 2018 12″x7.1km Condensate Gas Pipeline Flushing (hydrocarbon removal) from Subsea Wellhead to F23DP-A Platform 29-Aug-18 11-Sep-18 Sarawak Shell Berhad / Sapura Offshore Sdn Bhd
Offshore Sarawak, Malaysia
7 EPCC for Prai Terminal Diesel Subsea Pipeline Replacement – Provision of pipeline cleaning, gauging, flooding and hydrotesting 10″ x 900m Rigid Pipeline from Onshore Terminal to Offshore Offloading Terminal 28-Aug-18 12-Sep-18 Chevron Malaysia Limited / HSAP Sdn Bhd
Onshore/Offshore Penang, Malaysia
8 Flexible Flowline, Riser and Export Hose Pre- Commissioning for FSO Mekar Bergading – Provision of Filling and Leak Testing 6″x2.5km Condensate Gas Flexible flowline WHHP Platform to FSO Mekar Bergading 16″x300m Export Hose from FSO Mekar Bergading to Floating End 7-Jul-18 31-Jul-18 Hess E&P / Franklin Offshore International Pte Ltd / Starke Marine Sdn Bhd
Offshore Kelantan, Malaysia
9 PAN Malaysia Transportation and Installation of Offshore Facilities (for Year 2017-2018)
SSB 2018 Pipeline – Provision of pipeline pre- commissioning
10″&16″ – Spool testing, flooding for tie-in, cleaning, gauging, filling and hydrotesting
16″ – Dewatering, air drying and nitrogen purging/packing
10″x68km E6DPA-D35DRA, 16″x16km E6DPR-E8DRA 20-Jun-18 20-Aug-18 Sarawak Shell Berhad / Sapura Offshore Sdn Bhd
Offshore Sarawak, Malaysia
10 SEPAT and Riser Temporary Disengagement and Hook- Up Campaign for Petronas Carigali Sdn Bhd – Provision of Flexible Flowline Flushing/Pigging, Leak Testing and Annulus Vacuum Testing 6″x200m Crude Oil Flexible WHHP Platform to Sepat A FSO 4-Jun-18 21-Jun-18 Petronas Carigali Sdn Bhd / Fame Klaut Sdn Bhd / Starke Marine Sdn Bhd
Offshore Terengganu, Malaysia
11 Ultrasonic Intelligent Pigging Inspetion for Gas Lift Pipelines – Provision of equipment and personnel for pipeline cleaning, auxiliary pumping for UTIP, dewatering, air drying an dnitrogen packing. 4″x20km EBA Platform to CHRA Platform 4″x7.5km EBA Platform to WBA Platform 18-Apr-18 21-May-18 Sapura Exploration & Production (PM) Ltd / Quest Integrity
Offshore Terengganu, Malaysia
12 Pengerang Development Project: Provision of pumps and accessories to support filling and testing of sphere tanks 2nos Sphere Tanks 22-Jan-18 10-Mar-18 Punj Llyod / Sceptre Power Sdn Bhd
Onshore Johor, Malaysia
13 Crude Oil Transfer for West Desaru Pipeline: Supply of oil discharge hoses and fittings for crude ol transfer 8″ x 12km West Desaru Platform to FPSO 8-Feb-18 8-Feb-18 Petrofac Limited / Amaniaga Resources Sdn Bhd
Offshore Terengganu, Malaysia
14 Crude Oil Transfer for West Desaru Pipeline: Provision of personnel and equipment for transfering of crude oil from platform back to FPSO during pig stuck recovery 8″ x 12km West Desaru Platform to FPSO 6-Jan-18 22-Jan-18 Petrofac Limited / Amaniaga Resources Sdn Bhd
Offshore Terengganu, Malaysia
15 Laying of Gas Transmission Pipeline from Meranti View to Banyan Avenue in Jurong Island: Provision of personnel and equipment for MFL pig stuck recovery 28″ x 6km SLNG Pipeline from Meranti View to Banyan Avenue 1-Jan-18 10-Jan-18 WEC Engineers & Constructors Pte Ltd / SP Group / H Rosen Engineering
Onshore Jurong Island, Singapore